20,290
edits
mNo edit summary |
mNo edit summary |
||
Line 45: | Line 45: | ||
* If a test fails, it is reported to the operator. The user can mark the UUT as needed. When it is repaired, the board can be tested again. | * If a test fails, it is reported to the operator. The user can mark the UUT as needed. When it is repaired, the board can be tested again. | ||
[[Category: | [[Category:Old]] |